Work package 1 – Smart plant vision

This work package had a number of objectives that formed the basis of the work for the rest of the project.

01

Identify existing state of the art solutions as a basis for developing HyperCOG elements, including defining frameworks for suitable use cases.

03

Identify high-level system and user requirements

02

Assure that the ethical, legal (privacy and security) requirements are taken into consideration and followed

04

Identify the requirements to be fulfilled by the cyber-physical system