Smart plant vision

Work package 1 – Smart plant vision

This work package has a number of objectives that will help form the basis of the work for the rest of the project.

    • Identify existing state of the art solutions as a basis for developing HyperCOG elements, including defining frameworks for suitable use cases..
      • Assure that the ethical, legal (privacy and security) requirements are taken into consideration and followed
      • Identify high-level system and user requirements
      • Identify the requirements to be fulfilled by the cyber-physical system
[pagelist_ext child_of="current" show_image="1" image_width="211" image_height="125" depth="-1" show_content="0" show_title="0" hierarchical="0" sort_order="asc"]

Work package point of contact